Saturday, May 11, 2019
Building a House Utilizing Traditional Brick and Block Construction Coursework
Building a reside Utilizing Traditional Brick and Block Construction - Coursework ExampleThis research tells that the construction of brick and block traditional houses begin with the shaft of the trench. The trench is the site where the foundation will be laid on and should be well inspected ahead the concrete is laid. This must be done in accordance with the plan of construction. The plan is very submissive precisely when revealing the load-bearing walls and the width of the tranches to be excavated. When building the wall the choice of brick and block to be used is very important. This affects the brick to be used in the foundation and when building the course block whole caboodle as far as color and size are concerned. The foundation trench concrete is thereof laid down to a depth at least 150mm or as specified in the plan. After the laying of the concrete, the bricks and blocks are laid down in cavity wall construction depending on the planned design style. The constructio n of the two walls is done with the two skins constructed next to one another departure a cavity in between them. The traditional brick and block develop a relative warm 9-inch wall. The main challenge despite the thickness is the risk due to exposure to moisture. However, with the cavity, it is difficult for water to lay across the void between the two skins. To effectively prevent dampness, there is need to clear up the cement falling in between the walls during construction. This is primarily because if left there for long, it will pile up hence creates a bridge which will accelerate moistening the wall course. The builders also need to depict both the brick-work and block-work skins together but carefully and at a regular interval.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.